Swimming Pool

 

TSPA

Swimming Pool

The Swimming pool was started by Dr.C.N.Gopi Natha Reddy,IPS, Addl.DGP and Director of APPA foundation stone laid by Sri Swamijith Sen,IPS,DGP,AP construction was started on 19.2.2005 and construction was completed and Sri N.Kiran kumar Reddy,Honble chief minister of AP was inaugurated on 22.12.2010 The total swimming capacity 40 members the length of swimming pool is 25X50 The Swimming

Timmings: Morning 6.30am to 9.00 for Trainees and staff of RBVRR TGPA